No Nama Peserta K A T ST P PT HN H P PK Alasan
1 NURIZKAY KONSULTAN - 76.585.789.1-331.000 79,51 Rp. 95.590.000,00
Rp. 95.590.000,00
2 CV. Indo Prima - 01.654.757.2-331.000 75,25 Rp. 97.867.000,00
Rp. 97.867.000,00
3 CV. MITRA YENUKO PRATAMA - 01.514.887.7-331.000

4 CV. NURCAHAYA UTAMA - 03.233.582.0-333.000

5 DINAMIKA TEKNIK - 01.514.809.1-331.000

6 CV.ANDALAS CONSULINDO - 03.254.282.1-203.000

7 CV. CITRA NUGRAHA KONSULTAN - 01.485.146.3-331.000

8 CV. ALCANTARA REKAYASA - 70.672.209.7-331.000

9 PT. WANDRA CIPTA ENGINEERING CONSULTANT - 02.585.033.0-216.000

10 CV. AFTA ENGINEERING CONSULTANT - 02.652.697.0-331.000

11 CV. SUMBER TEKNIK NUSANTARA - 81.214.971.4-331.000

12 KAWAT EMAS - 31.711.329.8-331.000

13 CV. Yagana Consulindo - 66.270.487.3-216.000

14 CV. Djasa Merlang Consultants - 02.358.821.3-331.000

  • A Evaluasi Administrasi
  • T Evaluasi Teknis
  • ST Skor Teknis
  • P Penawaran
  • PT Penawaran Terkoreksi
  • HN Hasil Negosiasi
  • SH Skor Harga
  • SA Skor Akhir
  • K Evaluasi Kualifikasi
  • SK Skor Kualifikasi
  • SB Skor Pembuktian
  • H Evaluasi Harga/Biaya
  • P Pemenang
  • PK Pemenang Berkontrak